Vision Center – Phase Two (2010-2014)
Building a Living Church of the Future…

Now, in 2009 we are ready for Vision Centre. To remain where we are is not our intention. Tomorrow beckons. By God’s grace we will continue to fulll our calling. Our VISION is to win souls, build people, impact community and reach nations.
By faith we will expand our facilities in VISION CENTRE to provide additional space for greater revival growth. With enlarged capacity, we can grow even more.

“What kind of a house will you build Me?” (Acts 7:49), the Lord asks.
Vision Centre is conceptualized, designed and created for multi-faceted ministries using sacred space that is God-glorifying and encompassing concepts that are smart, living and natural. The Centre is purpose-built for Spirituality, Humanity and Enterprise.

The facilities will include:
1. Multi-Purpose Hall (1,664 sq.m)
- with stage and lobby, Conference and Big Meetings for 1,200 persons
- with catering facilities, Banquet seating for 800 persons
- with courts and changing rooms, Sports complex for badminton, basketball, netball, futsal, gymn.
2. Carparks (11,100 sq.m)
- Covered three-level lower ground, and an open air car park for about 500 cars;
- Drop zones for functions, the elderly and physically challenged
3. Garden Chapel (64 sq.m)
- for wedding, water baptism, prayer and meditation and outdoor functions

4. Halls (2 x 240 sq.m)
R1, R2 – Two adjoining halls that can cater to 150 persons each.
5. Function Rooms (5 x 100 sq.m)
C1-C5 – Function for small meetings and seminar. These can also be used for bookshops, offices, studios and musical production rooms.
6. Prayer Cockpit (260 sq.m)
The highest point of the building with a view of the surrounding area is dedicated for 24/7 prayer ministry.

COSTING FOR VISION CENTRE (Phase Two)
- Construction costs : RM19 million
- Furnishings: RM4 million
- Miscellaneous: RM2 million
Total: RM25 million
THE FUTURE
Incorporating the concepts of Phase Two, the third and final stage will be the building of a 3,500 seating Convention and Conference Center, additional 550 car park lots and other church facilities that will meet the needs of a growing congregation and our global vision.
Vision Center – How it all Began
Visison Center – Consolidation Phase (2007-2008)
TO GOD BE THE GLORY!